欧冠平台

News

    Sinopec Southwest adding high-yield gas well

     (Reporter Meng for) released yesterday, Sinopec Southwest Oil and Gas Field exploration yuanba exploration area continental achieved significant results, confirmed the existence of this layer system yielding gas reservoirs.
     Sinopec, February 15, Yuan Lu 7 well Xujiahe three sections by acid pressure testing, access to natural gas production of 1.208 million cubic meters. This is the yuanba Lu phase shallow Xujiahe three sections for the first time over one million cubic meters of industrial flow, and also following the February 12 yen Lu 5 wells in the artesian group Pearl red segment trial received 1.5039 million cubic meters of natural gas production, yuanba explore continental exploration another significant results. Yuan Lu 7 wells yield, confirmed the existence of this layer system yielding gas reservoir.
     It is understood that the yuanba gas field construction is one of the "12 major construction projects Sinopec is the largest natural gas construction projects Following the Puguang Gas Field and the East Gas Transmission" project.
     According to the plan, the yuanba gas field will be built in late 2013 the annual output of 1.7 billion cubic meters of purified gas production capacity, built by the end of 2015 the annual output of 3.4 billion cubic meters of purified gas production capacity. After the completion of yuanba gas field, will be the key state construction projects "East Gas Transmission" is another important gas source.

彩乐彩票,杭州高铁彩票,六福彩,英豪彩票,吉祥彩票快3,河北人中彩票,彩票大盘奖,彩票大神们,聚鑫城彩票,口袋彩票中,移动彩票,连中彩票正版,赢尔彩票,河北体彩积分,蒙特卡罗彩票,彩宏娱乐,湖北体彩贵州,甘肃福彩,红神彩票平台,金牛彩票地址,顶呱刮彩票,网络版捕鱼游戏,彩乐彩票,快三开奖数字,江苏彩票加盟,乐亿彩票网,网上快三注册,信利国际彩票,甘肃福彩,牛彩网开奖号,分分快三购买平台,永旺彩票,元角分彩票,爱彩票游戏,彩票复式推荐,日博体育官网下载,全面娱乐彩票,七星彩票计划,人人棋牌平台,扑克快三开奖,彩票GG彩票,零点棋牌,好易通买彩票,彩票快乐游戏,今日丹东体彩,达人彩票</html>